Onion Lake Cree Nation SPS No. 6 and Force Main ISC Project No. AT317

Project Description:

Installation of 6,ooo meters of 150 mm DR11 HDPE Sanitary Main and all related valves, manholes and appurtenances via horizontal directional drilling and open cut technologies, installation of a pre-cast lift station and construction of a sewage pumping station to service the new school site on Onion Lake Cree Nation. Completed hydro-testing, commissioning and personnel training.

Fishing Lake First Nation School Site Servicing INAC Project

Project Description:

Installation of 6,600 meters of 150 mm HDPE DR11 Sewage Force main, 6,100 meters of 250 mm HDPE DR11 Water Main, valves/manholes and all other related appurtenances. Installation of a pre-cast lift station and construction of a sewage pumping station inclusive of all civil, building, electrical/ instrumentation and mechanical/HVAC components. Completed hydro testing, commissioning and personnel training.

Town of Langham Sewage Pumping Station No. 2 Upgrade

Project Description:

Installation of a new sewage pumping station in the Town of Langham inclusive of all civil, electrical/instrumentation, mechanical/HVAC and building construction. Installation of a pre-cast lift station, muffin monster assembly, underground piping and all related appurtenances. Completed hydro-testing, commissioning and personnel training.

Cold Lake Municipal Water and Sanitary Service Upgrade – Phase 1

Project Description:

Excalibur Mechanical Ltd., on behalf of the Provincial of Alberta, constructed the Cold Lake Municipal Water & Sanitary Service Upgrade – Phase 1 project which included connection to the existing City of Cold Lake water main and sanitary manhole.  Asphalt excavation, and restoration to facilitate tie-ins to existing City of Cold Lake infrastructure. Concrete removal, disposal, and restoration to facilitate tie-ins to existing City of Cold Lake infrastructure.  Installation of a water meter vault and water meter. Installation of three sanitary and water air release valves and precast concrete chambers. Clearing and grubbing to accommodate pipe and chamber installation.

Supply and Horizontal Directional Drilling of:

  • 1650m of 50mm diameter HDPR DR 11 Sanitary Pipe
  • 2140 m of 75mm diameter HDPE DR 11 Water Pipe.
  • 10m of 40mm diameter HDPE DR11 Water Pipe.
  • 150m of 25mm diameter HDPE DR11 Water Pipe
  • 45m of combined 50mm diameter and 25mm diameter HDPE DR11 Sanitary and Water pipe, respectively.
  • 520m of combined 50mm diameter and 40mm diameter HDPE DR11 Sanitary and Water pipe, respectively.
  • 470m of combined 50mm diameter and 75mm diameter HDPE DR11 Sanitary and Water pipe, respectively.

Utility crossings including local gas, power, and telecommunications. Three water service connections within the Provincial Park. Supply and installation of three septic tanks and pumps, and one new Cisterns and pump c/w all required electrical components. Abandonment of one existing water well and removal and disposal of one septic tank including surface restoration.  Gravel surface restoration for pipe lateral installation and all required surface restoration.

Five Mile School Site Servicing

Project Description:

Extension of the sanitary sewer system and water distribution system from Carriage Lane Drive to the Five Mile Community Hall.  The installation will occur primarily within the road right of way for Township Road 714. Project consisted of both a horizontal directional drilling component and a traditional open cut installation component for the proposed sanitary sewer and water system.  The horizontal directional drill will be for the Force Main installation, and the open cut methodology was used for the gravity main portion.

Five Mile Hall School Site Water & Sanitary Servicing

Project Description:


Excalibur Mechanical Ltd., on behalf of the County of Grande Prairie No. 1 and Beairsto Engineering Ltd. installed approximately 3,100 meters of 6 HDPE DR11 via directional drilling, approximately 3,600 meters of 8 HDPE DR11 by means of open excavation and horizontal directional drilling and approximately 500 m of 10 SDR35 Gravity Sewer by means of open excavation. Complete with all related hydrants, valves, manhole chambers and related appurtenances. Work was completed within the right of way on the North Side of Township Road 714 crossing Carriage Lane via directional drilling to the Southside of Township Road 714. Work continued within the ROW eastbound on the southside of Township Road 714 past Range Road 53 turning North across Township Road 714 and terminated at the proposed Five Mile School Site.

 

M.D. of Foothills Millarville Water Supply Pipeline

Project Description:

Excalibur Mechanical Ltd., on behalf of the Municipal District of Foothills No. 31, constructed the M.D. of Foothills Millarville Water Supply Pipeline-Contract No. 1 a 10,800 meters treated water supply pipeline between NE 12-20-3 W5M near Dunham Lane in the Town of Turner Valley and NW 2-21-3 W5M at the south end of the Millarville water pumping station. The Project footprint included temporary workspace and permanent easements, encompassed an area of approximately 21.6 hectares. The entire 100 mm HDPE DR11 watermain was horizontal directionally drilled and included installation of six directly buried air release valves and nine isolation valves. The pipeline was installed across Highway 22 in two locations. Temporary access, staging facilities, erosion, and sediment control measures, dewatering systems, signage, and construction fencing, was installed during construction. Permanent structures included the water supply line and related valves.

Town of Vegreville Prosperity Industrial Park Lift Station

Project Description:

Excalibur Mechanical Ltd., on behalf of the Town of Vegreville and MPE Engineering Ltd., proposes to complete the Town of Vegreville Prosperity Industrial Park Lift Station which consists of supply and installation of Septage Receiving Station package, precast concrete sewage wet well; pumping and communication systems; electrical, instrumentation and controls; heating and ventilation; generator; building foundation, masonry block building and miscellaneous concrete; exterior and interior piping and connections; and miscellaneous sitework, gravel access road and yard piping.

Town of Vegreville Prosperity Industrial Park Water & Sanitary Servicing

Project Description:

Excalibur Mechanical Ltd., on behalf of the Town of Vegreville and MPE Engineering Ltd, proposes to complete the Town of Vegreville Prosperity Industrial Park Lift Station which consists of supply and installation of 440 meters of Watermain; 3,310 meters of Sanitary Force main; Watermain valves, Force main valves and air release valves and related appurtenances.

 